The is a commission that I have been working on lately. I even laid the tile.
A soda fountain is going to sit on the left side. There are shelves on the inside.
The is a commission that I have been working on lately. I even laid the tile.
A soda fountain is going to sit on the left side. There are shelves on the inside.
Phil Says:
January 10th, 2006 at 12:14 amVisit Phil
nice work Gabe! is this the second time you’ve laid tile or did Tony do the tile on the wine rack? what’s the cabinet made out of?
Gabe Says:
January 10th, 2006 at 3:45 amVisit Gabe
The cabinet is made out of birch ply with poplar trim. Then I am going to stain the whole thing with minwax dark walnut.
josh Says:
January 11th, 2006 at 6:26 pmVisit josh
looks good gabe, did you handplane that thing to perfection or what?