How to Save $10,000 on Your Attic Remodel

Published on July 23, 2008

Well, it may not work for you, but it worked for us. Current Portland Building Code requires that stairs must be a minimum of 9 inches deep (run) and a maximum of 8 inches high (rise). Remodels like ours must also conform to this standard, unless they include an “Existing stairway that leads to existing finished living space that was created with a building permit (Verify prior permits at the Development Services Center).”

Portland Stairway Rise and Run Diagram

That last part is key. Because while our attic space was definitely liveable before we pulled down the vintage paneling, its stairs are more definitely non-conforming. Our run is anywhere from 8.25 to 8.5 inches, with an 8 inch rise, and a barely-noticeable nosing. This may not seem like much of a difference, but our estimates to bring the stairs into conformance started at a cool 10K, with structural changes that might have required re-designing the kitchen, attic stairs … you’ll pardon the pun if I call it a slippery slope.

The plumbing permit for our 1927 House

But, we lucked out big time when we went down to the building office for the first time. You see, there was an existing building permit on file. A plumbing permit, anyway. (From 1927, even though we’d been told our house was built in 1928!). And if I may draw your attention to the line reading “Stories and Class of building,” you’ll see the magic words:

“new, fr. 1 1/2 sty dwg.”

Apparently, that’s old school builder-speak for “new one and a half story dwelling.” The second floor was intended as-built for living space, and its stairs for daily use. Hence, we are grandfathered in, by a probably now great-grandfather of a plumber working for Standard Plumbing and Heating Company in 1927. They’re still in business today, and now, so are we.


Where I’ve Been Hiding: Remodeling the Attic

Published on July 6, 2008

Whew, it’s been a LONG time since I’ve last posted, and to you, dear reader, I apologize. I’ve embarked on adventure that has been taking up a lot of my time, and I’m not talking about my homebrewing hobby

Sarah and I have begun remodeling our attic. It all began with some plans (with some help from my friend and contractor Andrew Young), which led to a building permit, which led to the purchase of a sawzall, which led to … me neglecting this blog. But let’s move on, shall we?

The Plans

Our Attic as it currently stands

We are fortunate enough to have a full-size attic - the plumbing permit for our house in 1927 listed it as 1 1/2 stories (saving us about $10,000, a story which I’ll tell another day) and we’re planning on converting the existing space (right) to a master bedroom and bath, which will up our home’s totals to 3 bedrooms, 2 baths, and about 1500 square feet of living space. Here are the plans for what the new space should look like:

The attic as it will hopefully look

The Demo

I have always heard that demolition is the best part of a project, and I have to say, it has been fun, if a bit sweaty and dusty. But … we’re almost done. Most of the attic’s walls and ceiling were covered in some vintage wood paneling whose surface concealed some very old insulation. When you pulled down the paneling, the insulation and miscellaneous roof debris came with it, coating my head with asphalt, roofing nails and the occasional abandoned wasp nest. Good times. Next, I’ll regale you with stories of chimney removal. Really good times!

Attic with paneling and insulation partially removed.

Roof debris with occasional wasp nests

Attic with paneling removed